Huahin Hillside Hamlet

Huahin Hillside Hamlet, where the reality of your dream home will be everything you dreamt it would be and more...

There are so many dreams that disappoint when they become reality. That is why at Huahin Hillside Hamlet their aim is to under-promise, but over-deliver. So remember, whatever we say here, you can expect so much more when actually visiting or living in our home-away-from-home development.
 Huahin Hillside Hamlet is under construction is also not far from Huahin city, very nice environment, fresh air and cool mountain breeze all year round. The Project area is around 24,000 m2. Contemporary designed houses with Thai style exterior view and fully functional utility area of European standards. There are 2 types of houses: a one-storey bungalow and a two-storey house. The Bungalow has 2 types with 3 different styles and the 2-storey house has 2 types and 2 different styles.
 
PROJECT HIGHLIGHT 
Total of 2 phases
     - First located on 16,000 sq.m. land (10 Rai) 28 units.
     - Second located next to the first, total land area of 6,400 sq.m. (4 Rai) 11 units.
 
Location
Project located at Hua Hin Municipality 4 Km. from downtown about 5 -7 minutes driving and it is close to airport and Hua Hin hospital.
 
Weather
Located near Huahin beach and so receives a cooling sea breeze all year long. Borfai local Thais call the spot - Wind field
 
Scenery
West side of the project surrounded by mountains and the East faces the sea.
 
Water supply
We have already been granted approval to use the water supply from Huahin municipality's tap water supply system (Due to rapid growth of Huahin city, insufficient water supply is now becoming an issue. Many projects chose water supply from artesian wells, even though well water may cause unpleasant outcome to sensitive skin or leave stain on sanitary ware because of unstable acid and alkaline portion in the water)
 
Structure Overview               

- Steel structures used fully meet all stringent safe standards

required.

 

- All 3 external walls are built with two- level red brick, ensuring walls are resistant to high impact and heat.

 

- Concrete construction work: foundation bases, ground bases, ground beams, upper beams used only well know Chang( Elephant) Brand finished cement. Plastering work used only Tiger Brand grade A cement.

 

- All the house have double- strata beams: cross beams 20×40 upper beams 15×35 cm.

 

- All electrical wiring is in conduit and flushed into the wall.

 

- A wastewater treatment tank is installed to segregate wastewater into the development’s sewerage and drainage system before it goes into the septic tank, from becoming full.

 

- All drainage pipes are 6 in ( 15.24cm) in diameter, made from PVC, not asbestos, and include sumps are sediment traps at regular intervals , eliminating any  major problem with broken pipes and blockages in the future.

 

- Roof tile use CPAC  Neustile  or equivalent.

 

- The ceiling of the eaves is constructed of spaced laths made from hardwood ,  creating a suitably beautiful finish. The laths allow airflow and prevent the attic from becoming to hot.
 
Please scroll back to the top of the page to view the pictures of the show house, from the link to the right hand side, in the "Related Proeprties" section.

Find Property

Reference
Area
Type
Price
  For sale For rent
 

Newsletter

E-mail
  Sign up Remove
 

Vehicle Tracking

Protect your vehicle and track it where ever it goes. Have a State of the Art GPS tracking system installed in your vehicle. Visit http://www.asiatracker.net for more information

Skype Us

Skype Me™!